Dental Practice - Hampshire
Project
Installation in a Dental Practice, outside of normal working hours in a sealed room.
Date
June 2025
Location
Fleet, Hampshire
Project Overview
We were commissioned to install a high performance air conditioning system in a sealed dental treatment room within a busy private dental practice. The room required strict temperature control to meet clinical standards, especially given the nature of the procedures conducted in a confined, sealed environment.
Client Requirements
Maintain a consistently low and stable temperature
Ensure silent operation to avoid disruption during treatments
Operate efficiently in a sealed, pressure controlled room with limited ventilation
Comply with healthcare regulations and hygiene standards
Our Solution
After an initial site assessment and consultation with the practice manager, we designed and installed a wall mounted split system using a high efficiency Daikin Unit. The system offers rapid cooling while maintaining quiet operation, ideal for a clinical setting.
Key features of the installation:
Energy efficient Daikin technology for precise temperature control and reduced running costs.
Wall mounted indoor unit with low noise output and easy to clean filters.
Discreet external condenser installed with minimal visual impact and secure pipe routing.
Fully sealed installation and fittings to maintain a hygienic environment.
Remote control and programmable scheduling for effortless temperature management.
Challenges Overcome
Working within a sealed, sterile room required strict attention to detail. We coordinated closely with the practice's operational schedule to avoid disruption, conducted all work outside of working hours, and ensured the system complied with healthcare regulations.
Outcome
The client was extremely pleased with the result. The new system keeps the treatment room at the required temperature throughout the day, even during peak summer hours. The unit operates quietly and efficiently, improving comfort for staff.